Safe Work Method Statement . Organisation details Name Flooring Ideas Pty Ltd . Contact . Project details Project : Bob and Denise Williams, 13 Western St, Dalby Qld 4405 : Activity : Lay vinyl floor covering on a concrete subfloor : Equipment . Electric grinder, roller, hand tools, vacuum cleaner . Grind concrete floor Check power leads .
Get Support OnlineMethod statement templates are often used by organizations to ensure consistency in documentation. iAuditor Mobile App for Efficient Method Statements. Method statements are important safety documents, but can be time consuming to prepare, burdensome to capture signatures and easy to lose. A digital solution like iAuditor can:
Get Support OnlineMay 18, 2005 · Allow the area to soak for 5-10 minutes. Remove the adhesive using a floor machine equipped with a 3M black floor pad (or equivalent), ensuring that the floor is kept wet in the area where the machine is operating. [The floor machine must be a low-speed floor machine that spins the floor pads at no greater than 175 revolutions per minute.] Warning
Get Support OnlineSep 12, 2012 · METHOD STATEMENT FOR EXTERNAL PAINTING 1.1 GENERAL INSTRUCTION 1. All work shall conform to BS 6150; BS 1336, BS 245; MS 125: 1985 Enamel Paints; MS 134: 1989 – Emulsion Paints, Exterior; MS 903: 1987 – Emulsion Paints, Exterior; and approved manufacturer's specific recommendations.
Get Support OnlineMay 18, 2005 · Allow the area to soak for 5-10 minutes. Remove the adhesive using a floor machine equipped with a 3M black floor pad (or equivalent), ensuring that the floor is kept wet in the area where the machine is operating. [The floor machine must be a low-speed floor machine that spins the floor pads at no greater than 175 revolutions per minute.] Warning
Get Support OnlineThe Floor Grinder Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of floor grinders used for surface preparation of concrete floors prior to the application of coatings or coverings.
Get Support Onlinesawing, grinding, and drilling/coring techniques are preferred for brick, stone, asphalt, concrete and other hard materials and surface. The resulting water generated does become s contaminated with the resulting sediment and may not be discharged untreated to .
Get Support OnlineCutting Concrete Pipes – For this activity, some special safety procedures should be taken to prohibit the pipe from moving while cutting, specifically when a handheld saw is used. A hazard during pipe cutting can be counted to be the pressure from the increased flange at the pipe-end resulting in closing and pinching the saw blade, resulting .
Get Support OnlineVinyl sheet flooring installation method is easy and can be effortlessly achieved with correct procedures, tools and approach. Vinyl sheet floorings provides more choices as they are available in a variety of styles to accent your decor. This flooring is perfect for kitchens and bathrooms floors.
Get Support OnlineGuarantee - Concrete Sidewalk Repair, Concrete Grinding Repair · Method statement for repair of concrete surface 1. TABLE OF CONTENTS 1. GENERAL 2. INVESTIGATION AND EVALUATION OF DAMAGED CONCRETE SURFACES 3. CONCRETE REMOVAL 3.1 Impacting method (for honeycombed and exposed re-bar) 3.2 Grinding (for abrupt or gradual irregular surfaces) 3.3 .
Get Support Onlinemethod statement for screening material – beltconveyers.net. old stone quarry for sale . free download screening and crushing work method of statement . concrete floor grinding risk assessment and method statement . »More detailed
Get Support Onlinefrom floor to floor) If the aggregate is deep it will not be worth grinding that deep. Running the grinder at a low RPM may increase grinding speed in the course steps (14 and 30 Grit) by allowing the diamonds to penetrate the floor without overheating. This is most effective on soft concrete or concrete less than a year old. Experiment with speed
Get Support OnlineIf not, download this Basic Construction Method Statement Template and read through it so that you get the knowledge of the steps that you need to follow to develop the statement that you find it necessary to prepare a perfect model. Without wasting any time download this PDF template for free. 9. Concrete Construction Method Statement
Get Support OnlineConcrete grinding requires specialized equipment and skill. We can do either wet or dry concrete grinding. However, wet concrete grinding creates a lot of messy concrete sludge, and is better suited to outdoor spaces. Dry concrete grinding, on the other hand, can be the perfect method for smoothing interior floors.
Get Support OnlineIf you are installing on top of concrete, you will have to use bolts that can go through the concrete surface. 3. Grinding. Another option that you may have is to grind down the floor. This works best if you have a large hump in the middle of a concrete slab. If you have a hump in a wood subfloor, you can sand it down with a sander.
Get Support OnlineNote: The BlueSafe Floor Grinder SWMS document is highly comprehensive in nature and is not a blank SWMS Template. Download A Sample Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
Get Support OnlineApr 14, 2020 · The end result was the polished concrete contractor needed to grind deeper to remove the blemishes even though the project was not originally bid to grind that deep. For the last year or so, we have been using the wet cure method with curing blankets left on the slab for three days on the polished concrete areas.
Get Support Onlinemethod statement for screening material – beltconveyers.net. old stone quarry for sale . free download screening and crushing work method of statement . concrete floor grinding risk assessment and method statement . »More detailed
Get Support OnlineCreate a concrete risk assessment and method statement in minutes Concreting firms are saving time and money creating documents with HANDS HQ. Easy to use and no need to mess with Word templates again! Watch the demo
Get Support OnlineThe following statement is intended to outline the proposed method of construction to be carried out by Metropolitan Basements at the above address. The project consists of the installation of drainage, underpinning, erection of rc walls, construction of first floor deck, installation of drainage. 2. CONSTRUCTION METHODS
Get Support Online8.8—Finishing Class 8 floors (two-course unbonded) 8.9—Finishing Class 9 floors 8.10—Toppings for precast floors 8.11—Finishing lightweight concrete 8.12—Nonslip floors 8.13—Decorative and nonslip treatments 8.14—Grinding as a repair procedure 8.15—Floor flatness and levelness 8.16—Treatment when bleeding is a problem
Get Support OnlineIf you are installing on top of concrete, you will have to use bolts that can go through the concrete surface. 3. Grinding. Another option that you may have is to grind down the floor. This works best if you have a large hump in the middle of a concrete slab. If you have a hump in a wood subfloor, you can sand it down with a sander.
Get Support OnlinePolished concrete floors are becoming a popular design element in retail stores, corporate office buildings, schools and LEED certified buildings. The National Floor Safety Institute (NFSI) is an independent tester of floors, including polished concrete. Its method, NFSI 101-A, Standard for Evaluating High-traction Flooring Materials,
Get Support OnlineHow to Prepare Concrete Floors for Epoxy Coating. When people think of epoxy coatings, residential garages and auto showrooms come to mind. Epoxy coatings, however, are ideal for numerous applications including healthcare institutions, industrial settings, offices, and much more.. Decorative epoxy coatings come in an amazing variety of colors and styles, including solid color, metallic, quartz .
Get Support OnlineApr 01, 2020 · This procedure shall apply to the repair Of all defective concrete in large quantities for walls, using high strength, free flowing, cementitious micro concrete of size 40 – 300 mm thickness. The areas to be repaired are to be as shown on the drawings or as indicated by the Client/Consultant. The areas are to be marked out in the works and .
Get Support Onlinework method statement tiling wms: tiling page 7 of 7 i have been consulted and i assisted in developping the work methos statements that apply to my work activities. i will comply with its safe work practice. print names position/trade signature date joe gedoun director/site manager 31-aug-16 craig pensini site supervisor 31-aug-16
Get Support OnlineConcrete placement to high wall pours (i.e.. over 3.0m) will be by concrete pump. The pump bagging will be initially positioned at the base of walls and then progressively withdrawn. On high wall pours care will be taken to ensure the concrete is fully compacted at lower levels and around box outs or cast in pipes.
Get Support OnlineSince concrete grinding provides more durability, a floor that has been prepared using this method will last longer. After the process of grinding and applying epoxy, you can get years of use from the floor. Low Maintenance. A floor that is prepared by grinding the concrete will need very little maintenance.
Get Support OnlineConcrete Warping. Similar to how you can grind down a wooden floor, you will need to do the same thing for concrete warping. A 4-inch or 8-inch angle grinder can be used with a cup-wheel .
Get Support OnlinePolishing gives shining effect to the marble floor. For marble floors in good condition, polishing is enough to bring back the shine. Industrial diamond floor pads with grit 400, 800 and 1500 are efficient. Step 4: Buffing. Buffing is the final stage in polishing. It's also known as crystallization of marble. Here marble gets treated with .
Get Support Online